Ralli Moholla’s water network is now operational!
29 June 2026
After several months of construction, the Ralli Moholla water network in Chattogram, Bangladesh, is now officially operational. The infrastructure completed over the past few months is already providing the first households with safe, reliable access to water.
The water tower, distribution network, and borehole are now fully operational. Since the project’s inauguration on June 29, our teams have been steadily connecting households to the network. More than 50 families already have running water directly in their homes.
New household connections are continuing, with the goal of reaching 100 connected families by the end of the summer.
Congratulations to the entire team, and thank you to all the partners and donors whose support made this water network possible.

Related news
05 November 2026
The Philippines project in pictures
Discover our work in the Philippines through our new video.

31 July 2026
Our 2025 Annual Report has arrived!
Discover a year of dedication, inspiring impact stories, meaningful collaboration, and challenges overcome. Thank you for your continued support. https://www.betterwithwater.org/app/uploads/2026/07/2025_BWW_Annual-Report.pdf

02 July 2026
A new beginning through water: Inaugurating our water network in Basey
On July 2, we celebrated the inauguration of our new water network in Basey, on the island of Samar in the Philippines. Thanks to this project, dozens of families will soon have access to safe and reliable drinking water directly in their homes. This project is the result of several years of work to identify […]


make life better with water
You too, make a difference with better with water
